Deliverables for Workpackage 1
Id | Project Management | Status |
---|
Deliverables for Workpackage 2
Id | Shopping malls demands and retrofitting potential | Status |
---|---|---|
D2.1 |
Shopping malls features in EU-27+Norway
Expected by: M9 |
(3.1 MB) download |
D2.2 |
Shopping malls inefficiencies
Expected by: M8 |
(5.1 MB) download |
D2.3 |
Typical functional patterns and socio-cultural context
Expected by: M8 |
(3.7 MB) download |
D2.4 |
Interaction with local energy grid
Expected by: M10 |
(11 MB) download |
D2.5 |
Main drivers for deep retrofitting of shopping malls
Expected by: M15 |
(4.3 MB) download |
Deliverables for Workpackage 3
Id | Reducing energy needs and greenhouse gas emissions | Status |
---|---|---|
D3.1 |
Virtual IDP (Integrated Design Process) library
Expected by: M30 |
(2.6 MB) download |
D3.2 |
Thermal zone optimisation
Expected by: M24 |
(4 MB) download |
D3.3 |
Ventilative cooling
Expected by: M |
(8.1 MB) download |
D3.4 |
Concept of modular multifunctional façade (still subject to the European Commission approval)
Expected by: M24 |
(12 MB) download |
D3.5 |
Green integration
Expected by: M24 |
(5.6 MB) download |
D3.6 |
Smart coating materials
Expected by: M24 |
(12 MB) download |
D3.7 |
Daylight strategies
Expected by: M24 |
(5.6 MB) download |
D3.8 |
Prototype of combined daylight system
Expected by: M24 |
(1.4 MB) download |
D3.9 |
2 assessed prototypes of thermo acoustic components
Expected by: M24 |
(3.3 MB) download |
Deliverables for Workpackage 4
Id | Solutions for enhancing energy efficiency | Status |
---|---|---|
D4.1 |
Integrative Modelling Environment
Expected by: M30 |
(2 MB) download |
D4.2 |
Retrofitting technologies, solutions and scenarios
Expected by: M30 |
(4.4 MB) download |
D4.3 |
iBEMS architecture prototype
Expected by: M36 |
Confidential |
D4.4 |
ICT systems platform
Expected by: M36 |
(4.8 MB) download |
D4.5 |
Scenarios and solutions for shopping mall energy grid
Expected by: M36 |
Confidential |
D4.6 |
Batteries with management control system and electrolyser stack platform (still subject to the European Commission approval)
Expected by: M24 |
(4.8 MB) download |
D4.7 |
Shopping mall energy distribution
Expected by: M24 |
(3.5 MB) download |
D4.8 |
Artificial lighting system
Expected by: M36 |
Confidential |
D4.9 |
Visual, emotional and energy effects of a new lighting concept
Expected by: M36 |
(3.4 MB) download |
D4.10 |
BIEM: Building Integrated Electric mobility system
Expected by: M36 |
Confidential |
D4.11 |
BIEM components
Expected by: M30 |
(2 MB) download |
Deliverables for Workpackage 5
Deliverables for Workpackage 6
Id | Demonstrations and assessment | Status |
---|---|---|
D6.1 |
Management plans of the demo-cases retrofitting
Expected by: M42 |
Confidential |
D6.2 |
Retrofitting implementation (still subject to the European Commission approval)
Expected by: M42 |
(1.7 MB) download |
D6.3 |
Energy audits
Expected by: M24 |
(5.1 MB) download |
D6.4 |
Energy savings results (still subject to the European Commission approval)
Expected by: M45 |
(7.5 MB) download |
D6.5 |
IEQ results (still subject to the European Commission approval)
Expected by: M45 |
(9.6 MB) download |
D6.6 |
Sustainability assessment of the demo-cases (still subject to the European Commission approval)
Expected by: M45 |
(4.9 MB) download |